From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:01 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Morris Howard 

Last updated:  11/30/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Mobile, AL  36695
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: MAHoward_Resume_10-12-15.docx

Resume Value: d4aji44g7duutfa5   

  

 

Morris A. Howard

251-591-8738

morris.howard@live.com

 

ESTIMATOR / PLANNER, SCHEDULER / PROJECT CONTROLS MANAGER / PROJECT MANAGER

I have worked in the construction and manufacturing marketplace for over 35+ years.  Construction background includes civil, structural and mechanical phases within the industrial, petro-chemical, refinery, power generating, and shipbuilding markets.  Engineering related skills cover estimating, planning/scheduling, project management, subcontract management and controls.  Contract hire for the last 18 years. Office skills include a strong understanding of engineered drawings and contract verbiage. Highly organized and computer literate.

 

PROJECT TYPESPERSONAL DATA

Pulp & PaperMcGill Institute, Grad. 1970

PetrochemicalAlabama Christian College:

Power Plants: Fossil Fuel/Nuclear               Associate Degree Program:

Offshore Oilfield facilitiesDesign/Drafting

ShipbuildingUS Air Force: Electrical Tech.

Marine Craft retrofitAmerican Welding Society                                         

Steel Mini-millEvans Technology: Primavera P3e

Poly-Silicon PlantBechtel Corp: Primavera P6                           

Pipeline receiving station

SRU/TGU/Amine Recovery Unit installation

Refinery & Cryogenic Gas Plant

PROJECT ACTIVITIESCOMPUTER APPLICATIONS

Project Mgmt./SupervisionWindows

Project ControlMicrosoft Word

EstimatingWord Perfect

Proposal FormulationMicrosoft Excel

Cost AnalysisMicrosoft Project

Subcontract Management Primavera: Sure Track

Planner/SchedulerFinest Hour/3.1/P3e/P5 & P6 ver. 7

MarketingMicrosoft Power Point

Microsoft Outlook

TSQL Visual Basic Editor

EMPLOYMENT TIMELINE

Enterprise PDH Project (Amec Foster Wheeler) Mont Belvieu, TX : Jan. 2015 present

Daniel Power Plant (Southern Co.) Escatawpa, MS : Feb. 2012 to Dec. 2014

ThyssenKrupp Stainless USA (Calvert, AL) : Sept. 2010 to Feb. 2012

BP America, Inc. (Pensacola, FL): May 2010 to Sept. 2010

Bechtel: Chevron CCR Project (Pascagoula, MS): March 2008 to April 2009

PMSI: Jeffery Energy Fuel Gas Desulfurization (St. Mary’s, KS): Sept. 2007-March 2008

L-Con Constructors: Meeker Cryogenic Gas Plant (Meeker, CO): June 2006-Sept. 2007

CBI/Howe-Baker: Valero Refinery SRU, TGU & ARU installation (Houston, TX): Jan. 2006-June 2006

Bender Shipbuilding & Repair: Eng. Budget Control Mgr.(Mobile, AL)Nov. 2003-Jan. 2006

TEPSCO: Slug Catcher Fab & Install (Coden, AL): Feb. 2003-Nov. 2003

Bender Shipbuilding & Repair: Vessel Completion planner/scheduler (Mobile, AL): Nov. 2002-Feb. 2003

Kvaerner Metals: Professional Consultant (Pittsburg, PA): Sept, 2001-Aug, 2002

Kvaerner Metals: IPSCO Steel Mill EPCM (Axis, AL): May, 1999-July 27, 2001

McAbee Construction, Inc.: Mitsubishi Poly Silicon Project, (Theodore, Ala.): Feb, 1997-April, 1999

Belmont Constructors, Inc.: TRICO Steel Mill (Decatur, AL): June, 1995-Feb, 1997

Bechtel/PMB: Enserch Garden Banks retrofit (Pascagoula, MS): Feb, 1994-June, 1995

Industrial Services of Mobile, Inc.: 1992-1994

Brown & Root, Inc.:  1989-1992

 

DETAILED PROFESSIONAL EXPERIENCE

 

v Enterprise PDH (Amec FW) contract via CB&A Project Management

Senior Planner/Scheduler

Propane Dehydrogenation Unit Project

Mont Belvieu, TX

Megan Coggin (205) 995-6163

·   Develop the Master Schedule using Engineering FEED documents, Purchasing deliverables and Scope of Work.

·   Schedule built using Primavera P6 -Version 7.

·   Developed and installed WBS, Global and Project Level Codes, and divided the project into manageable sections (area’s) for ease and logic in planning build strategy. 

·   Assist in RFQ development to assure build strategy consistency as shown in the IMS.

 

v Plant Daniel (Southern Co.) contract via CB&A Project Management

Senior Planner/Scheduler

Flue Gas Desulfurization Project

Escatawpa, MS

Jim Griffin (205) 995-6163

·   Develop the Master Schedule using Engineering FEED documents and Scope of Work.

·   Schedule built using Primavera platform (P6 Ver.7).

·   Developed and installed EPS Level Codes to be utilized by 4 other sub-project files.

·   Incorporate all engineering IFC’s and Purchasing deliverables to drive construction activities.

·   Assist in RFQ development to assure build strategy consistency as shown in the IMS.

v ThyssenKrupp Stainless, USA

Senior Planner/Scheduler

Stainless Steel Melt Shop

Calvert, AL 36513-1300

(251) 829-3397

·   Develop the IMS for the construction of the TKL Stainless Melt Shop from Engineering through Commissioning / First Heat.

·   Project Super-User administering all rights and privileges to Primavera P6 Ver.7

·   Developed and installed all Global Codes using SDK.

·   Incorporate all engineering schedules developed using MS Project into Primavera format. (.mpp to .xer) and update on bi-weekly basis.

·   Assist in RFQ development to assure build strategy consistency as shown in the IMS.

v BP America Inc.

Logistics Support

Deepwater Horizon Response

Pensacola, FL 32502

(850) 912-8640

·   Set-up the Community Outreach Center in Pensacola, FL.

·   Planned and scheduled activities for the Local Community Support team.

·   Assisted the public with opportunities and issues regarding “Vessel’s of Opportunity (VoO)”, “Qualified Community Responders (QCR)”, Claims and other issues.

v Bechtel Corporation

Senior Planner/Scheduler

Chevron CCR Project (Total Contract Valued @ 500mm)

Pascagoula, MS 39562

(228) 938-5682

Five months in the Worley Parsons Engineering office in Houston, Texas, planning and scheduling the construction activities for the Continuous Catalyst Recovery project in Pascagoula, Mississippi utilizing Primavera P5. The process was to develop a Level 3 schedule, integrating the engineering and purchasing deliverables with the construction task. Thus developing a IMS (Integrated Master Schedule)

Man-loaded the construction schedule using the Level 3 estimate. Produced histograms and leveled. Reviewed Critical path with upper management and assisted to perform the risk analysis. I was then tasked to assist in development of the status matrix between three separate projects (CCR, ETP & PBOP). 

Moved to Pascagoula, MS and functioned as the senior planner/scheduler during the course of construction, utilizing Primavera P6. Integrated and aligned the sub-contractors schedules to follow the IMS, developed “rules of credit” in order to develop Earned Value measured against actual man-hours, tracked progress, formulated workarounds due to delays from underground obstructions and plant operational needs.

v PMSI

Senior Scheduler

Jeffery Energy: FGD Upgrade Project (Total Contract Valued @ 26mm)

25905 Jeffery Road

St. Marys, KS 66536

(785) 458-8945

Corrected build strategy in an existing schedule and man-load the “WESTAR FGD (Fuel Gas Desulfurization) UPGRADE” utilizing Primavera P3, Version 3.1.

The project contained front end task to provide limestone, dewatering, rack and underground piping during the Unit 1 Outage, all to complete concurrently. Unit 3 & 2 outage would follow, respectively.

v L-Con Constructors

Project Coordinator

12301 Kurland Drive

Suite 200

Houston, TX 77034

(281) 484-5266

Primarily in main office to develop standardized forms for use in project controls.

o   Document Control

o   Weekly Reporting

o   Civil Progress

o   Structural Progress

o   Process Equipment Progress

o   Piping Progress

o   (Progress forms based on rules of credit)

o   RFI and CO procedure

Etc.

Also assisted in quantity take-off for industrial construction projects and preparing preliminary schedules utilizing Primavera P3, Version 3.1.

v L-Con Constructors

Project Coordinator

Meeker “1” Gas Plant (Total Contract Valued @ 450mm)

27991 County Road 5

Rifle, CO 81650

(970) 878-5435

Project Controls.

o   Developed and maintained project schedule using Primavera P3, Version 3.1.

o   Developed cost report format used to forecast future expenditures.

o   Developed progress and performance reporting methods used for projection of scheduled mechanical completion dates and “at completion” man-hour forecast.

v Chicago Bridge and Iron / Howe-Baker Engineers

Assistant Project Manager / Planner / Scheduler

Valero Refinery

SRU/TGU & ARU Unit Installation (Total Contract Valued @ 38mm)

Houston Ship Channel

Houston, TX

Planned the receiving and setting of seven modules weighing, on average, 50 to 70 tons each. Developed all critical lift plans with the 3rd party crane rental company and reviewed with the client for approval and scheduling prior to erection.

Developed the build strategy for all civil, structural and interconnecting piping activities and loaded into Primavera P3 schedule.

This was a very difficult project due to the unit being located in middle of the operating plant and in a very tight (postage stamp) area.

v Bender Shipbuilding and Repair

Engineering Budget Control Manager / Planner / Scheduler

265 S. Water Street

Mobile, AL. 36601

Developed the procedures necessary to assess budgets, determine predecessor/successor relationships, assign steps and appoint engineering personnel to perform the completion of design/production drawings and specifications.

Built and maintained all engineering schedules in Primavera P3e.

Calculated earned man-hours and measured against actual man-hours for reporting of productivity.

v  TEPSCO

Mechanical Superintendent / Project Controls

Williams Mobile Bay Gas Plant / Slug Catcher Project

6000 Rock Road

Coden, AL.

(1)    Planned activities for the installation of piping and equipment.

(2)    Reviewed “Bid Documents” and compared to IFC drawings for formulation of all variances.

(3)    Report project cost, resource management, and productivity.

(4)    Estimate Change Order Cost and submit for Client approval.

(5)    Expedited all “Field purchased materials” and subsequent invoicing.

(6)Set up and managed all “Document Control”.

(7)    Authored and maintained “transmittal” records and logs.

v Bender Shipbuilding and Repair

Planner / Scheduler

Responsibilities included planning daily activities for structural, piping and outside machinist activities. Kit all materials necessary for the completion of the work. Schedule the task in Microsoft Project and status. Reported manpower requirements and productivity to upper management. Aided in transitioning the scheduling program from MS Project to Primavera P3e.

v  Kvaerner Metals

Professional Consultant

Responsibilities included the chronological detailing of business dealings with a singular Subcontractor who failed to perform on the IPSCO project. The situation was subsequently resolved prior to arbitration.

v  Kvaerner Metals

Contracts Manager

IPSCO Flat Products Steel Mill Project, (Axis, Ala.) Ph. (334) 679-1501 (Subcontracts Valued @ 150mm)

Managed subcontracts during the construction phase of the project.

·               Assembled bid packages.

·               Conducted pre-bid meetings.

·               Reviewed bids for evaluation and award.

·               Assisted subcontractors on insurance issues (OCIP: Owner Controlled Insurance Program).

·               Reviewed all requests for extra work and processed results.

·               Maintained contractor to client relationships.

v  McAbee Construction, Inc.

Project Manager/Scheduler/Planner: Cost Control: Change Order Estimator

Mitsubishi Poly Silicon Project, (Theodore, Ala.) Ph. (334) 408-0900

(Estimated over 1.5mm in C.O. and Additional work)

Managed of over 120 field personnel during the construction phase of the Project, maintained and updated the project schedule using Primavera P3, networked our activities with other Contractors.

Report project cost, resource management, and productivity.

Estimate Change Order Cost and submit for Client approval.

v Belmont Constructors, Inc.

Scheduler/Planner: Cost Control: Change Order Estimator: Pipe ISO Detailer

TRICO Steel Project, (Decatur, Ala.) Ph. (205) 341-0700

(Estimated over 1.25mm in C.O. and Additional work)

·               Maintained and updated the project schedule using Primavera Sure Track, and networked our activities with other Contractors.

·               Report project cost, resource management, and productivity.

·               Estimate Change Order Cost and submit for Client approval.

·               Determine routings and produce isometric drawings on small-bore piping. (Hand drawings)

v  Belmont Constructors, Inc. cont.

Construction Estimator (Projects ranging from 50k thru 50mm)

Pensacola, FL.

Formulated complete cost estimates for industrial construction projects by performing detailed takeoff from drawings, specifications and site visit information for the purpose of determining material and labor requirements; assembled subcontract (Request for Quotation) packages and selected Subcontractors; prepared preliminary schedules utilizing “Primavera” Finest Hour, Project Management Software.  I composed the “Qualifications and Clarifications” to the Proposals.  I assisted in assembling the package for review with upper management, making all revisions, and preparing the final proposal for submittal to the Client.

Upon successfully bidding a project receiving award, I budgeted the project, reviewed with field supervision on all aspects of the work, kept constant updates on progress and resolved any discrepancies over the scope of work.

v  Bechtel/PMB

Project Estimator

Pascagoula, MS.

Modification and Upgrade of the ENSERCH Garden Banks 388

(Estimated over 2.75mm in C.O. and new scope work)

The project scope was to modify/retrofit a Victory Class Oil Rig so that production processing as well as drilling could be performed offshore.  I researched work activities with Engineering and the Project Management Team to detect if any “client requested” work activities were beyond the original Lump Sum project scope.  Developed cost estimates for such work and submitted to the Client on a Change Order basis.

v Industrial Services of Mobile, Inc.

Construction Estimator

Mobile, AL.

Prepared complete cost estimates for industrial projects and developed construction schedules.  Set-up projects upon successful bid, purchase bulk of materials, formulate and negotiate all variances.  Track project, updating schedule on MS Project and resolve all problem areas.  I handled all communications with the Clients and Subcontractors.

v  Brown & Root, Inc.

Construction Estimator - Southeast Regional Office

Mobile, AL.

Prepared complete cost estimates for bid proposals of industrial construction projects by computing estimates for materials, labor, and equipment and production activities.  Detailed drawing take-off for determining material and labor requirements, selecting appropriate subcontract quotations, formulating preliminary construction schedules, contacting owners’ representatives for sight visits and engineering questions, and review of the final estimate with upper management.

 

Prior to the positions above, I worked as a structural steel fitter, pipe fitter and pressure vessel fabricator for 12 years.

 

1 | Page

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Sr. Planner/Scheduler

CB&A for AMEC Foster Wheeler

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Sr. Planner/Scheduler

Desired Status:

Full-Time
Part-Time
Per Diem

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-AL-Mobile/Dothan

Relocate:

Yes

Willingness to travel:

No Travel Required